SITC of 4 Nos. x 1500 Kva Euro Diesel make Diesel Rotary UPS (NO-BREAK) system at MSIL R&D Center, Rohtak
SITC of 4 Nos. x 1500 Kva Euro Diesel make Diesel Rotary UPS (NO-BREAK) system at MSIL R&D Center, Rohtak
SITC of 3 Nos. x 1500 Kwe MWM Natural Gas Gensets at OIL Tengaghat (TPS), Assam
SITC of 13 Nos. x 3916 Kwe (50.91 MW) MWM Model TCG 2032 V16 Natural Gas Gensets based power plant along with Absorption Chiller for Air Conditioning. (5 Nos. x 3916 Kwe (19.52 MW) at DLF Building , 5 Nos. x 3916 Kwe (19.52 MW) at DLF Building 10 and 3 Nos. x 3916 Kwe (11.75 MW) at DLF Silokhara, Gurgaon)
Project Status : Completed
SITC of 3 Nos. x 1500 Kwe MWM Natural Gas Gensets at OIL Tengaghat (TPS), Assam
Project Status : Completed
Project Status : Completed
End User : Ministry of Railways, CORE
Project Status : Completed
Project Status : Completed
Project Status : Ongoing
Project Status : Completed
Project Status : Completed
Project Status : Completed
Project Status : Completed
Project Status : Completed
Project Status : Completed
PMC : Engineers India Limited
Project Status : CompletedPMC : Engineers India Limited
Project Status : Completed
© Copyright 2023 – Green Power International Pvt. Ltd., All Rights Reserved. | Designed & Managed by Virtual Pebbles Digital
© Copyright 2023 – Green Power International Pvt. Ltd., All Rights Reserved.
Designed & Managed by Virtual Pebbles Digital